Facilitated Integration Technology Client List

Client Location Project Date Completed
Andersen Consulting Dallas, TX. Interactive Learning Strategy for the Six Plants of the Hoechst Celanese Southwest Region April, 1995
ARAMCO Riyadh, Saudi Arabia Direction Setting Strategy for Control and Optimization, Five Plants March, 1997
ARAMCO Riyadh, Suadi Arabia Master Plan for the Economic Optimization of Seven Refineries January, 1998
Chevron Chemicals SE Asia Singapore Advisor to Project Manager for Detailed Design and Implementation of all Plant Systems (Oronite) and Asia Pacific Region Supply Chain Management System June, 1998
Chevron Richmond, CA Contract in place for Supplemental Staffing April 2010
Chevron Products Richmond, CA Facilitation of Control Objectives Analysis and Control Design Analysis for their Reinstrumentation and Advanced Control Projects December, 1998
Chevron-Texaco ERTC Richmond, CA Facilitation of Control Objectives Analysis for a styrene monomer plant planned for construction. December, 2002
CITGO Corpus Christi, TX Programmed Expert Systems to Advise Operators in Abnormal Situation Management. December, 1995
CITGO Corpus Christi, TX Modeled the Business Process to Prioritize Initiatives for Increased Plant Profitability February, 1999
CITGO Corpus Christi, TX Detailed Modeling and Economic Analysis of the Planning and Scheduling Activities for Increased Interaction Between Plant Operation And Market Opportunity March, 1999
ExxonMobil Europe and Asia Assistance in rolling out POIS-2, ExxonMobil's integrated control, Business, and information system August, 2001
Flint Hills Corpus Christi, TX Benchmarking, Cost Analysis, Plans for Change and Advisement On Upgrades to the Facility and Equipment in the Laboratory  
Frontier Refining El Dorado, KS Analysis of their processes and systems against the industry to determine a plan for optimal business support. October 2001
Frontier Refining El Dorado, Ks Cheyenne, Wy Denver, Co Business Process Modeling, On-Going; Projected Economic Analysis, Change Plans, Functional Specifications For Change, Instruments for Establishing Scope and +/- 10% Costing, Project Plans September 2002
Frontier Refining Cheyenne, WY Review of the laboratory function with advisement on improvement; Specification of a LIMS system. September, 2003
Haynes and Boone Houston, TX Expert witness for APC related case. July 2005
Hoechst Acetyls Singapore Singapore Planning and Implementation of all Information Systems and (now Celanese Technology Infrastructure for a Ltd., Singapore) "Grassroots" Chemical Plant September, 1997
Hoechst Celanese
(now Celanese Ltd)
Pharmaceuticals & Chemicals
Bishop, TX. Information Systems Master Plan & IT Staff Restructuring September, 1994
Hoechst Celanese
Research Division
Corpus Christi, TX. Market Research on the Viability of Marketing a System Developed for Utilizing DCS Data December, 1996
Hoechst Celanese
AMG Division
Summit, NJ SAP Requirements Definition Workshop for the Nine Plants and Headquarters of the AMG Division December, 1994
Hoechst Celanese
AMG Division
Summit, NJ Benchmarking Sales and Financial Systems and Market Analysis of the use of SAP in the plastics industry March, 1995
Hoechst Celanese
SW Region
(now Celanese Ltd)
Dallas, TX. Environmental Information Initiative - Requirements Definition, Application Selection, Implementation February, 1996
Honeywell, Inc. Phoenix, AZ Assistance with business process Analysis, process analysis and Economic benefits for their clients. November 2002
IBM Houston, TX. Guidance in Fitting IBM's Expertise and Offerings to the Downstream Oil & Gas Market July, 1995
Marathon Petroleum Findlay, OH Contract for Supplemental Staffing April 2011
McKinzie Houston, TX Industry knowledge transfer on the Aromatic production from reformate (BTX extraction) around the world. We Additionally provided insight on catalytic Reforming in refineries. August, 2006
Pavilion Technologies Austin, TX. Guidance in Establishing Pavilion's Products Properly in the Process Industry Marketplace. Assistance with Application Deployment of Neural Net Tools. September, 1998
PetroChina Bejing, China Assistance with review of quality, environmental, and safety measures for the corporation.  
Petrocon Engineering Beaumont, TX Assistance with Information Systems Planning and Implementation for ARAMCO March, 1998
Phillips Petroleum
Specialty Chemicals
Borger, TX. Formation of a Master Plan Which Will Interact With, Leverage, and Supplement the Site Refining and Corporate Systems and Strategies November, 1995
Placid Refining Company, LLC Port Allen, La Audit of IT systems and analysis of the IT staffing. Specifications for IT staff positions. June, 2005
Placid Refining Company, LLC Port Allen, La Determination of requirement for the LIMS; issuance of an RFI; analysis of RFI results with Selection assistance. September, 2005
Placid Refining Company, LLC Port Allen, La Determination of requirement for a Financial and Marketing System; issuance of an RFI; analysis of RFI results with Selection assistance. November, 2005
Placid Refining Company, LLC Port Allen, La Determination of requirement for a Maintenance Management System, including analysis of Business proceses; issuance of an RFI; analysis of RFI results with Selection assistance. August, 2006
Saras Cagliari, Italy Audit of the Analyzer Group and the PRocess by which they maintain analyzers. Included Staffing analysis. November, 2006
Sasol Secunda, South Africa Business Modeling, Economic Analysis of Benefits of Change, Change Management, Production Quality Management March, 2002
Sasol Secunda, South Africa Analysis and Recommendation for Insturments and Analyzers January, 2002
Sasol Secunda, South Africa Added Advanced Process Control to the Octene Unit using RMPCT July, 2005
Seibe/Foxboro/Simsci Foxboro, Massachusettes Assistance in Service Plans For Integrated Information Systems December, 1997
Sinclair Salt Lake City, UT Supplemental Staffing for Capital Project Management in the addition Of three new units. May, 2007 (projected)
Sunoco Philadelphia, Pa. Analysis of the QC process, with a suggested improvement plan. August, 2006
Sunoco Philadelphia, Pa. Analysis of Staffing Levels in the 3 NE Laboratory Locations September, 2005
Tesoro San Antonio, Texas IT Architecture. Tesoro had purchased multiple refineries and had multiple differing manufacturing systems. We drew up a plan for standardization and consolidation. December, 2004
Tesoro Salt Lake City, UT Site Audit, including Blending, Movements, Inventory Management, Laboratory, Planning and Scheduling, Operation , with Interactio to Marketing and Corporate Accounting. December, 2004
Tesoro San Antonio, Texas Determination of the actual amount o hydrocarbon and product loss in preparation for a loss management program. July, 2005
Tesoro San Antonio, Texas Project management and Work Change advisement to move to higher reliability, starting with Risk Based Inspection. Overall Reliability Strategic Vision for the Corporation. August, 2005
Tesoro San Antonio, Texas Assistance during IT audit in adjusting IT governance, systems, and standards to more closely align with the business. September, 2005
Tesoro San Antonio, Texas Assistance with improvements to Mass Balance, Yield Accounting, Hydrocarbon Loss processes and procedures.Assisting with standardizatino on one system for Mass Balance and Yield Accounting. September, 2006
Western Refining El Paso, Texas Manage the transition of all systems, networks, and telephone from Chevron, in some cases proprietary, to Western, on a tight timeline. January, 2003
Western Refining El Paso, Texas Installed Sigmafine for Yield Accounting and Mass Balance March, 2004
Western Refining El Paso, Texas Upgraded LIMS and added instrumentation July, 2004
Western Refining El Paso, Texas Changed Terminal Management System. Performed Debottlenecking on the Shipping Terminal August, 2004
Western Refining El Paso, Texas Staffing study of the operations Area, with an emphasis to work Allocations. September, 2005
Western Refining El Paso, Texas PHAs on three units, Review of the Plant PSM policy, Review of the Temporary Building/New Building Policy On-going, Projected April 2007